Core Values Construction installs single-ply roofing, including TPO, PVC and EPDM, on commercial and industrial buildings in Brighton, Michigan. This page covers new construction roofing for those buildings: where the roof fits in the construction schedule, which decisions need to be made before the roof is bid, and what a contractor should put in writing.
On a new building the roof is installed over a deck that has never been roofed, so there is no existing roofing system to tear off, but deck readiness, construction moisture and other trades still require checks. That puts plan coordination, weather protection and the construction sequence at the center of the roofing scope. If you are planning a new commercial building and want to talk through the roof, call (517) 260-3957.
Engineered Foundations: New Construction Roofing

A new commercial roof is an assembly, not just a membrane. It usually includes the structural deck, insulation, the roofing membrane, flashings at walls and openings, edge metal, and a drainage plan that moves water to drains or scuppers. Each layer depends on the one below it, so the roof is best planned together with the building design and not added at the end.
Michigan weather puts steady demands on that assembly. Roofs go through freeze-thaw cycles, snow loads, summer sun and wind, and the details at edges, corners and penetrations are usually where problems begin. For that reason, much of the work in new construction roofing is deciding how those details will be built and who is responsible for each one.
Reading the plans before bidding
Before a roof is priced, the roofing scope should be matched to the architectural and structural drawings. Useful items to check include the roof slope and drain layout, the insulation and membrane called for, parapet and edge conditions, and the number and type of rooftop units, curbs and stacks. If the drawings leave something open, such as the attachment method or flashing at a mechanical curb, it is better to settle it before work starts than to price it as an extra later.
Dry-in timing and sequencing
The roof assembly is installed once the deck is ready for the specified roofing system, with dry-in coordinated around other construction work to limit weather exposure. Timing matters because a deck left exposed can take on moisture, and insulation and membrane are best installed on a dry surface in suitable weather. Cold, wet or windy conditions can limit what can be installed, and some adhesives and sealants have temperature limits, so the schedule should leave room for weather.
Other trades often need roof access after dry-in. Rooftop units, piping and electrical work can add openings or foot traffic to a finished roof, so it helps to agree on who sets curbs, when penetrations are made, and how the new membrane is protected in the meantime. Owners can follow progress from the ground or from inside the building, and the roof itself should be accessed only by authorized personnel following site safety requirements.
Roof Decisions That Shape a New Construction Project
The table below lists the main decisions on a new low-slope commercial roof, what should be stated in writing, and where the limits are. It is a planning guide, and the project drawings and manufacturer requirements decide the final answers.
| Roof decision | What the plans or contractor should state | Limitation to keep in mind |
|---|---|---|
| Deck and substrate | Deck type, condition at dry-in, and who inspects it before insulation goes down | A roofing crew can only judge the deck it can see, so damage or moisture from construction delays may only show up at installation |
| Slope and drainage | Drain and scupper locations, tapered insulation if used, and where water is meant to leave the roof | Drainage is set by the building design, so problems found late may need design input and not just a roofing fix |
| Insulation | Type, thickness, and how boards are attached | Insulation choices also affect code compliance and building performance, which the design team confirms |
| Membrane and attachment | Product, thickness or specification, and mechanically fastened or fully adhered attachment | The right choice depends on the building, equipment, wind exposure and manufacturer requirements, not on one rule for every roof |
| Penetrations and curbs | Who sets curbs and stacks, and who flashes them | Late changes by other trades can add penetrations after the roof is in place |
| Edges and parapets | Edge metal, termination and flashing details | Details are often specified by the designer, so conflicts should be raised before bids are final |
| Closeout records | Photos of key details and the written scope | Warranty terms vary by product and installer, so the actual document governs |
Choosing a roofing system
Many new low-slope commercial buildings consider single-ply membranes. TPO and PVC seams are generally heat-welded, while EPDM seams are typically joined with adhesives or tapes, and each system has different strengths and details. Our pages on TPO and single-ply roofing in Brighton and EPDM roofing in Brighton explain those systems in more detail.
The right choice depends on the building’s use, rooftop equipment, traffic, exposure and project requirements, and it should be confirmed against the manufacturer’s requirements for the chosen assembly. A proposal should name the product, the thickness or specification where it applies, and the attachment method.
New Construction Roofing Services
Core Values Construction provides new construction roofing services for commercial and industrial buildings in Brighton, with a focus on single-ply installation. Our commercial roofing services page describes our work, including installation of TPO, PVC and EPDM systems.
A complete new construction scope should cover the roofing system and insulation plan, drainage details, flashings at walls, curbs and penetrations, edge metal, protection of the finished work, cleanup and closeout documentation. Because a new building has a project schedule, the scope should also state when the roofing crew is expected on site and what conditions are needed to start, such as a dry, clear deck and completed curbs.
Building envelope integration
The roof meets the walls, windows, doors and mechanical systems of the building, and those meeting points are where air and water can get in. Parapets, wall terminations, rooftop unit curbs, pipe penetrations and drains each need a flashing detail that suits both the roof membrane and the adjoining material. Settling those details with the designer and the other trades early avoids field improvisation.
How to Assess a New Construction Roofing Contractor
Two proposals for the same building can look similar and still describe different work. The questions below help bring the differences into view.
| Question for the contractor | Why it matters |
|---|---|
| Which roofing system and thickness is priced? | Different products and thicknesses are not the same roof, so bids that leave this out cannot be compared |
| How is the deck checked before installation? | Deck problems found after the membrane is down are harder and costlier to fix |
| What is excluded? | Items such as blocking, curbs, edge metal or temporary protection can show up later as extras |
| How are penetrations handled? | Mechanical and plumbing work often continues after dry-in, and roof openings need a plan |
| What records come at closeout? | Photos, the installed specification and any issued warranty documents support future maintenance and roof identification |
After the roof is in place, a written scope and photos of key details give the owner a record to rely on. If a leak or concern comes up later, a commercial roof inspection in Brighton documents the roof’s condition, and replacement work on existing buildings has different tear-off and existing-conditions requirements than a new-build roof.
When to take the next step
A few situations suggest it is time to talk to a roofing contractor. The drawings are complete enough to price the roof. The deck is nearly ready, and a dry-in date is being set. A mechanical contractor is changing the number or location of rooftop openings. Or two bids differ widely and the scopes are not clear.
To talk through a new building in Brighton, MI, call (517) 260-3957 and ask about new construction roofing services.
Frequently Asked Questions
At what stage of construction should the roof be installed?
Roofing is sequenced after the deck is ready, with dry-in coordinated with other construction work. The exact timing depends on weather, the deck’s condition and the project schedule.
Which roofing material is used on a new commercial building?
Many new low-slope commercial buildings consider single-ply membranes such as TPO, PVC or EPDM. The right choice depends on the building’s use, rooftop equipment, exposure and the manufacturer’s requirements.
What should a new construction roofing proposal include?
It should name the roofing system and thickness, the insulation plan, the attachment method, drainage and flashing details, exclusions, and closeout records. Ask for these in writing so bids can be compared.
Who handles roof penetrations for rooftop equipment?
That depends on the project. Agree early on who sets curbs, who flashes penetrations, and when openings are made, so the finished roof is protected from later damage.